Pages

Monday, October 31, 2022

XXVIII: Plumbing

We went over to finish writing on the studs on 10/22 and found much of the plumbing rough in complete.

The master bath, is on the right.  The shower surround is in the wrong ‘bay’ of the bathroom and isn’t plumbed yet.

The tub had water in it

As did the kids’ upstairs

The backside plumbing, from Ellie’s room, should we ever need to know what is where!

No comments:

Post a Comment